Wednesday, 29 February 2012

Problems encountered during our project.

Organisation

  • We often forgot our equiptment and lost props, which reduced our filming time.
  • We were always in our location looking around,talking rather than just getting on with the filming.
  • There were times when members of our group showed up late, or were absent.
  • Our planned meetings oftenly changed day.
  • It snowed which slowed down our filming by two days.
  • Transport to the locations often took too long.
Communication

  • Sometimes we would talk over each other so our thoughts weren't heard.
  • Our ideas weren't always expressed clearly.
  • We would often have arguments over our ideas.
  • It was challenging to contact members at times to meet up at the same time.
Technical

  • The lighting would oftenly be too dark so it caused poor lighting.
  • We forgot to charge the camera battery, so therefore it ran out quickly.
  • There was often a lot of traffic or noises in the background while we were filming which made it hard to hear the characters speaking.
  • At one point the camera was attatched too tight to the tripod, which caused a squeeking noise on the camera when filming.
Groups Dynamics

  • There were often times when one person did more than the other.
  • Sometimes there was way too much fussing about.
  • Group didn't always make agreements.

No comments:

Post a Comment